Room-by-Room 2026 Guide
Quick Answer: Condo renovation in Malaysia costs RM 80,000–150,000 for an entry renovation, RM 120,000–380,000 for a full interior renovation, and RM 300,000–680,000+ for a luxury high-rise or penthouse. PSF rates run RM 80–250 PSF entry to mid-range and RM 250–450+ PSF for premium finishes. JMB or MC approval is required before any hacking or wiring work begins. This guide covers every cost, every room, and every regulation you need to know.
Condo Renovation Cost Malaysia 2026 — Master Overview
All pricing on this page is aligned to the master cost guide at Interior Design & Renovation Cost Malaysia 2026. The table below gives you the complete reference for condo renovation costs across every unit size, scope, and finish level in Malaysia this year.
| Renovation Type | Cost (RM) | Size | Timeline | Tier |
|---|---|---|---|---|
| Entry Renovation | RM 80,000–150,000 | 600–900 sq ft | 6–8 weeks | Entry |
| Full Interior Renovation | RM 120,000–380,000 | 800–1,500 sq ft | 2–4 months | Mid |
| Luxury High-Rise / Penthouse | RM 300,000–680,000+ | 1,500–3,000 sq ft | 4–6 months | Luxury |
All figures are for interior renovation works only and exclude designer fees (5–8%), JMB renovation deposit (RM 1,000–3,000 refundable), furniture and soft furnishings, and the mandatory 15% contingency. Rates are Klang Valley 2026 market data. Penang and Johor Bahru may differ by 10–20%.
For bungalow, double storey, and new build costs — see the master cost guide that this page is part of.
Master Cost GuideWhich Condo Renovation Tier is Right for You?
Your renovation tier depends on the age of the unit, your lifestyle expectations, how long you plan to stay, and whether you are renovating to live in, rent, or sell. All pricing below is aligned to the Houz 2026 master cost guide.
Surface-level improvements — paint, flooring, basic kitchen and bathroom refresh. No full hacking. Suitable for investment units, rental preparation, or a quick lifestyle upgrade on a sound existing fit-out.
- Full interior repaint — walls, ceiling, feature wall
- Flooring: vinyl plank or tile overlay without full hacking
- Kitchen cabinet doors refacing or basic replacement
- Bathroom accessories, mirror, tap, and showerhead swap
- New light fittings and switches throughout
- Curtain tracks and blinds installation
Best for: Investment or rental units, buyers on a tighter budget, or units in sound condition that just need freshening up before moving in or listing.
Complete interior transformation — every room renovated, full custom joinery, new kitchen, bathrooms with proper waterproofing, full electrical and air-conditioning. The standard brief for owner-occupiers doing a once-in-a-decade renovation. JMB or MC approval required before hacking begins.
- Demolition: full hacking of existing tiles and ceilings (JMB approval required)
- Kitchen: full custom dry kitchen, quartz or solid-surface worktop
- Bathrooms: full waterproofing, large-format tile, mid-tier sanitary fittings
- Flooring: engineered timber or large-format homogeneous tile throughout
- Carpentry: floor-to-ceiling wardrobes all bedrooms, TV feature unit
- Electrical: full rewire, new consumer unit, LED lighting design
- Aircon: new inverter split-unit system all rooms
- Feature walls: fluted panel, limewash, or stone cladding
- Ceiling: plaster ceiling with cove lighting — living and master bedroom
Best for: Owner-occupiers buying a resale unit, upgrading a developer's basic fit-out, or families doing a complete lifestyle renovation before settling in long-term.
Prestige condominiums and penthouses in KLCC, Mont Kiara, Bangsar, and Damansara Heights — where the brief demands international-calibre execution. Full interior designer involvement, imported materials, and smart home integration are baseline expectations at this tier.
- Flooring: imported marble, travertine, or large-format Italian porcelain
- Kitchen: bespoke lacquered or stone-fronted cabinetry, island, European appliances
- Bathrooms: European sanitary ware — Duravit, Hansgrohe, TOTO, or Kohler
- Smart home: lighting automation, motorised blinds, multi-room audio, climate control
- Millwork: custom carpentry throughout with concealed storage
- Ceiling: architectural ceiling with cove, coffer, or backlit features
- Lighting design: full layered ambient, task, and accent lighting plan
- Interior designer: full-service, site-supervised — fee included in upper range
Best for: HNW and UHNW clients in prestige high-rises, penthouse owners, or investors targeting the premium rental market in Mont Kiara, KLCC, or Bangsar.
Not sure which tier fits your unit? The honest test: if you are living in the unit for 5+ years, move up one tier from your instinct — you will never regret quality you live with every day. If renovating for sale or rental, match the finish level to the buyer or tenant profile for your building. Over-capitalising on a mid-tier leasehold condo in a standard building rarely returns its investment. Speak to our team — we advise on the right scope for your specific unit, building, and objectives at no cost.
JMB & MC Rules — What You Can and Cannot Do
This is the section most homeowners skip — and most regret. Every condo renovation in Malaysia is governed by your building's Joint Management Body (JMB) or Management Corporation (MC). Work done without approval can result in fines, forced reinstatement, and serious complications when you sell.
- Hacking existing floor tiles (with written approval)
- Full bathroom tile hacking and wet area renovation
- Replacing kitchen cabinets and countertops
- New plaster ceiling and cornices
- Electrical rewiring within the unit
- New air-conditioning split units within the unit
- Internal non-structural partition walls
- New internal doors and frames
- Custom built-in wardrobes and carpentry
- Waterproofing and full bathroom renovation
- Structural changes to load-bearing walls
- Modifications to external facade or windows
- Changes to common property or shared systems
- Extending the unit's physical footprint
- Changes to main electrical riser or distribution board
- Changes to main plumbing risers or stacks
- Work outside permitted renovation hours
- Overcladding balconies or external walls
Most condominiums require a renovation deposit of RM 1,000–RM 3,000 (up to RM 5,000 for larger units) paid before work begins. This is refundable on satisfactory completion, but you will not have access to these funds during renovation. Factor it into your cash flow from day one.
The JMB Approval Process — Step by Step
-
Request Building Renovation Guidelines
Collect the full renovation rules from your JMB or MC office before any planning. Rules vary building to building — never assume.
Before planning begins -
Prepare Plan and Contractor Details
Most JMBs require a scope of works, before-and-after floor plan, and your contractor's company registration and insurance.
1–2 weeks preparation -
Submit Application and Pay Deposit
Submit the completed form with your deposit cheque. Keep receipts and copies of everything submitted.
Day 1 -
Await Written Approval Letter
JMB approval takes 1–3 weeks. Do not allow any work to begin before you have the written approval letter in hand.
1–3 weeks -
Renovation Within Permitted Hours Only
Strictly 9am–5pm weekdays and Saturday mornings in most buildings. Hacking and drilling may have tighter restrictions. Your contractor must comply — their workers' behaviour is your responsibility.
During construction -
Completion Inspection and Deposit Refund
Submit your completion notice. JMB inspects common areas for damage. Deposit is refunded within 2–4 weeks of satisfactory inspection.
Post-completion
Room-by-Room Condo Renovation Cost Malaysia 2026
Understanding room-by-room costs lets you make smarter trade-off decisions. Concentrate your spend where it returns the most: kitchen and master bathroom return the highest satisfaction and resale value. Here is every room, every tier, every key cost driver.
Kitchen — Dry & Wet
RM 28,000–120,000The kitchen is typically the single largest line item in a condo renovation and highest-impact for lifestyle improvement. Cabinet material is the primary cost driver — it accounts for 40–60% of the total kitchen budget.
| Finish Level | Cost (RM) | Cabinet Material | Worktop |
|---|---|---|---|
| Entry | 18,000–28,000 | Laminates ply | Basic quartz |
| Mid-Range | 28,000–65,000 | Solid timber laminates or matte lacquer | Quartz or engineered stone |
| Premium | 55,000–90,000 | Solid timber venner or laminates | Sintered stone or porcelaine quartz |
| Luxury | 90,000–120,000+ | Stone-fronted or bespoke lacquer | Imported marble or sintered stone |
Don't skimp on the worktop. A quality quartz or sintered stone worktop is the single decision that determines whether your kitchen looks mid-range or premium. It also prevents staining, cracking, and heat damage in heavy Malaysian cooking.
Master Bathroom
RM 18,000–90,000The master bathroom is the second highest-impact renovation in any condo — and where waterproofing quality matters most. A failed membrane causes leaks to the unit below, triggering neighbour disputes that cost multiples of what proper waterproofing would have cost. Specify a 10-year membrane system — always.
| Finish Level | Cost (RM) | Tile Grade | Sanitary Brand |
|---|---|---|---|
| Entry | 20,000–32,000 | Local homogeneous 600×600 | Standard Malaysian / Roca basic |
| Mid-Range | 28,000–60,000 | Branded 600×1200 or 300×900 | Grohe, Sorento, Roca mid, TOTO basic |
| Premium | 40,000–100,000 | Large-format porcelain | Duravit, Hansgrohe, TOTO mid |
| Luxury | 60,000–150,000+ | Book-matched marble or travertine | Duravit Axor, Gessi, Villeroy & Boch |
Common Bathroom(s)
RM 18,000–45,000 eachSame waterproofing requirement as the master, smaller footprint. Budget RM 18,000–34,000 for a functional entry renovation and RM 30,000–45,000 for a quality mid-range result that matches the master bathroom level.
Living Room & Dining Area
RM 25,000–95,000The living and dining area has the widest visual impact in any condo. Flooring, ceiling treatment, feature wall, and lighting are the four decisions that define the entire room's character. Spend here and save on a junior bedroom.
| Element | Entry (RM) | Mid (RM) | Luxury (RM) |
|---|---|---|---|
| Flooring | 4,500–8,000 | 8,000–18,000 | 18,000–50,000 |
| Plaster Ceiling | 5,500–7,000 | 7,000–12,000 | 12,000–35,000 |
| Feature Wall | 7,500–14,000 | 15,000–32,000 | 20,000–60,000+ |
| TV Unit / Display | 5,000–8,000 | 8,000–15,000 | 15,000–35,000 |
| Lighting (fixtures) | 1,500–3,000 | 3,000–8,000 | 8,000–20,000 |
Master Bedroom & Junior Rooms
RM 20,000–120,000 per roomBedroom renovation budget is dominated by built-in wardrobe cost — typically 50–60% of a bedroom's spend. Master bedroom first, then junior rooms at 60–70% of master cost is a sensible rule of thumb.
Electrical, Lighting & Air-Conditioning
RM 15,000–65,000Often underbudgeted. In older resale condos (10+ years), a full electrical rewire is frequently necessary — existing wiring may be undersized for modern appliance loads and smart switch systems. Always have a licensed electrician test the existing consumer unit before committing to a partial rewire.
Full Condo Renovation — Complete Cost Summary
Based on a 1,100 sq ft 3-bedroom condo in Klang Valley. Pricing aligned to the Houz 2026 master cost guide.
| Item | Entry (RM) | Mid-Range (RM) | Premium (RM) |
|---|---|---|---|
| Kitchen (dry) — full custom | 15,000–22,000 | 28,000–50,000 | 55,000–90,000 |
| Master Bathroom — full | 15,000–22,000 | 25,000–45,000 | 45,000–70,000 |
| Common Bathroom × 1 | 8,000–12,000 | 13,000–20,000 | 18,000–28,000 |
| Living + Dining | 10,000–18,000 | 22,000–40,000 | 38,000–70,000 |
| Master Bedroom full fit-out | 8,000–14,000 | 18,000–30,000 | 28,000–50,000 |
| Junior Bedrooms × 2 | 8,000–14,000 | 16,000–26,000 | 22,000–40,000 |
| Electrical rewire + lighting | 5,000–9,000 | 12,000–22,000 | 20,000–38,000 |
| Air-conditioning (3 rooms) | 6,000–10,000 | 10,000–18,000 | 18,000–35,000 |
| Hacking, demolition, disposal | 2,000–5,000 | 5,000–12,000 | 10,000–20,000 |
| Painting throughout | 2,500–5,000 | 4,500–9,000 | 7,000–15,000 |
| Estimated Total (1,100 sq ft) | RM 79,500–131,000 | RM 153,500–272,000 | RM 261,000–456,000 |
Add JMB renovation deposit (RM 1,000–3,000), interior designer fee (5–8% if applicable), furniture and soft furnishings (RM 15,000–80,000), and a 15% contingency to arrive at your true all-in project budget.
PSF Rate Guide, Cost by Location & Renovation Timeline
Three reference tools in one section: the PSF rate you should be quoting, how location affects your budget in Klang Valley, and a realistic timeline so you know what to expect and when.
Condo Renovation Cost per Square Foot — Malaysia 2026
Renovation Cost by Location — KL & Selangor
| Location | Building Type | Full Reno Cost | Premium vs KL Avg |
|---|---|---|---|
| Mont Kiara | High-Rise Condo | RM 180,000–480,000 | +10–20% |
| Bangsar / Bukit Damansara | Condo, Penthouse | RM 200,000–550,000+ | +15–25% |
| KLCC / City Centre | Serviced Apt, Penthouse | RM 200,000–680,000+ | +15–30% |
| Damansara Heights | Condo, High-Rise | RM 180,000–500,000 | +10–20% |
| Petaling Jaya | Condo, Serviced Apt | RM 120,000–350,000 | Baseline |
| Subang Jaya / Shah Alam | Condo | RM 100,000–280,000 | -5 to -10% |
Realistic Condo Renovation Timeline
-
Design & JMB Submission
Finalise scope, get quotations, prepare JMB submission documents with contractor details and floor plan.
2–4 weeks -
JMB or MC Approval Wait
Submit and wait for written approval. No work can begin legally until this letter is in hand.
1–3 weeks -
Material Procurement
Order tiles, kitchen cabinets, sanitary fittings. Imported items: 6–12 week lead time. Order before construction begins.
2–4 weeks (overlap with approval) -
Hacking & Demolition
Existing tiles, ceilings, and fixtures removed. Most disruptive phase — noise restricted to JMB-permitted hours only.
1–2 weeks -
M&E Rough-In
Electrical rewiring, plumbing alterations, aircon piping. Inspect and photograph all rough-in before it is concealed.
2–3 weeks -
Waterproofing, Plastering & Tiling
Waterproofing must cure fully before tiling begins. Do not rush this — failed waterproofing is the most expensive mistake in any condo renovation.
3–5 weeks -
Carpentry Installation
Kitchen cabinets, wardrobes, TV units, and all built-in joinery installed. Confirm all dimensions against drawings before installation.
2–4 weeks -
Painting, Snag & Handover
Full snag inspection before final payment. Submit completion notice to JMB for deposit refund. Timeline: 1–2 weeks after carpentry.
1–2 weeks
Frequently Asked Questions — Condo Renovation Malaysia
The most common questions Malaysian condo owners ask before planning a renovation — answered with the same transparency we bring to every client conversation. All pricing below is aligned to the Houz 2026 master cost guide.
-
Condo renovation in Malaysia in 2026 costs RM 80,000–150,000 for an entry renovation, RM 120,000–380,000 for a full interior renovation of an 800–1,500 sq ft unit, and RM 300,000–680,000+ for a luxury high-rise or penthouse in KL or Selangor. These figures are aligned to Klang Valley 2026 market rates and exclude designer fees, furniture, and contingency. See the complete 2026 master cost guide for bungalow and double storey costs.
-
Yes. Any condo renovation in Malaysia involving hacking, structural changes, plumbing alterations, or electrical rewiring requires formal written approval from your building's JMB or MC before any work begins. Cosmetic work such as painting and minor furniture changes typically does not. Renovation hours are restricted to 9am–5pm weekdays and Saturday mornings. A refundable deposit of RM 1,000–3,000 (sometimes up to RM 5,000) is required upfront. Read our full JMB & MC regulations guide for complete details.
-
Condo renovation cost per square foot in Malaysia in 2026: RM 80–150 PSF for entry-level work, RM 120–250 PSF for a full mid-range renovation, RM 200–320 PSF for premium finishes with smart home and European sanitary ware, and RM 300–450+ PSF for a full luxury penthouse fit-out. Condos cost more per square foot than landed properties because expensive items like kitchens and wardrobes are concentrated in a smaller built-up area.
-
A basic condo renovation takes 4–8 weeks. A full interior renovation of an 800–1,500 sq ft unit typically takes 2–4 months. A luxury penthouse renovation with bespoke joinery, imported materials, and smart home integration takes 4–6 months or more. JMB or MC approval adds 1–3 weeks before construction can legally begin, and restricted renovation hours (weekdays only) extend the timeline compared to a landed property project.
-
A condo kitchen renovation costs RM 18,000–2,000 for an entry finish with laminates plywood cabinets and basic worktop, RM 28,000–65,000 for a mid-range renovation with timber veneer or lacquer cabinets and quartz worktop, RM 55,000–90,000 for premium handleless lacquer with sintered stone, and RM 90,000–120,000+ for a full luxury kitchen with porcelain slab, bespoke cabinetry, and European appliances. Kitchen cabinets alone range from RM 1,200 to RM 1,800 per linear foot depending on material and hardware.
-
A full condo renovation in Malaysia includes: demolition and hacking of existing floors, tiles, and ceilings; full custom kitchen with cabinetry and worktop; master and common bathroom renovation with waterproofing, new tiles, and sanitary fittings; new flooring throughout; floor-to-ceiling built-in wardrobes all bedrooms; full electrical rewire, LED lighting design, and new power points; new inverter air-conditioning units; feature walls, plaster ceiling with cove lighting; and full painting throughout. Designer fees and furniture are separate.
-
Yes — a well-executed condo renovation in Malaysia can increase resale value by 10–25% in KL and Selangor's premium market. The highest-ROI renovations before sale are kitchen upgrades, bathroom renovations, fresh paint and new flooring, and new lighting. Avoid over-capitalising beyond the buyer profile for your building and location — a luxury marble kitchen in a mid-tier leasehold block will not fully return its investment. Read our full guide on how custom interiors boost resale value in KL and Selangor.
-
Renovations typically not permitted in Malaysian condominiums include: structural changes to load-bearing walls, modifications to the building's external facade or windows, changes to common property or shared systems, extending the unit's physical footprint, changes to the main electrical riser or distribution board, and changes to main plumbing risers or stacks. Even non-structural hacking usually requires JMB or MC approval. Always obtain your building's specific renovation guidelines before planning — rules differ between buildings. See our complete JMB and MC guide.
Ready to Transform Your Condo?
Houz Design provides detailed preliminary cost estimates based on your actual unit, building, scope, and finish level — before any commitment is required. No guesswork. No surprises.

Recent Comments